Taking half a day

Somebody who needs a morning off asks for the morning, not for a day. It costs half a day of their balance and the other half is worked normally.

This only means anything on a two-stretch shift. A shift with one stretch has no morning and afternoon to tell apart — see Shifts with one or two stretches.

What a day of leave costs follows that day's shift. Each shift has a Day value, 1 day unless HR set it to ½, split evenly between its stretches. On an ordinary two-stretch shift the morning is therefore half a day. Leave on a Saturday-morning shift the company counts as a whole day takes 1 day. Rest days and public holidays cost nothing.

Before you start

  • The employee works a shift with two stretches.
  • Nothing else. No permission is needed to ask for leave.

Steps

  1. Open MekongHRM in Telegram and choose New request.
  2. Choose Leave and the Kind of leave.
  3. Set From and To: the same day for a single morning or afternoon, or the first and last day of a longer leave.
  4. The form lists every day between them with the stretches you are rostered on that day, all ticked. Untick the ones you will still work — the morning of the first day, say, or an afternoon in the middle. Rest days and holidays are listed without a box, because leave on them costs nothing. The total under the list says how many days the ticked stretches come to, and changes as you tick.
  5. Press Send it.

What you should see

The approval card says the dates, the days and the stretches left out, so the approver sees the morning that is still worked.

Once it is approved, the grid shows that day as half worked and half leave. The stretch that was worked keeps its times; the other says Leave rather than Absent.

The days-worked figure for the month goes up by half a day, not by none and not by one.

Half days are held as halves exactly. Nothing in MekongHRM turns 0.5 into 0.499999 — a balance that drifts by a hundredth of a day is a balance somebody will eventually dispute.

If something goes wrong

The whole day is showing as leave. Both stretches were left ticked. Every rostered stretch starts ticked; untick the one that is worked.

Half a day was asked for on a one-stretch shift. There is nothing to split, so it covers the whole day and costs the shift's day value. If half days matter, the shift needs two stretches.

One day of leave counted as more or less than expected. Check the Day value of the shift on that day. A Saturday-morning shift set to 1 day takes a whole day, and a shift set to ½ day takes half. A request keeps the day count it was filed with, even if the shift's day value changes later.

The balance went down by a full day. Only annual leave draws on the annual balance. Check which kind of leave was chosen.

The afternoon still shows as absent after approval. The day is recalculated when the request is approved. If it has not changed, check that the month is not locked — a locked month is not recalculated.